COCACOLA THRACE BOTTLING PLANT - PERA Construction

 COCACOLA THRACE BOTTLING PLANT

INDUSTRIAL PLANTS AND WAREHOUSES

Client

:

COCA COLA / MAKSAN


Consultant

:

Foster Wheeler BMA


Project duration

:

1996 1997


Type of construction

:

Columns: Prefabricated concrete, Walls: Prefabricated concrete sandwich panels, Roof: Sandwich panels.


Total construction area

:

120,00 m


Total closed area

:

48,000 m



Share Tweet