Johnson Matthey Catalyst Plant Phase 2 - PERA Construction

 Johnson Matthey Catalyst Plant Phase 2

INDUSTRIAL PLANTS AND WAREHOUSES

Client

:

Johnson Matthey Catalysts, skp / Makedonya


Consultant

:

Hristovi Engineering Ltd.


Project duration

:

12 months (estimated)


Contract

:

General Contractor for Design & Build service of civil,mechanical and Electrical Works according to FIDIC Contract


Type of construction

:

Structural steel


Description

:

Rockwool insulated sandwich panel faade, steel sandwich panels on roof and terrace type flat roof.


Total construction area

:

36.000 m


Total closed area

:

20.000 m